Kenmore residents have an opportunity to help shape Mt Coot-tha’s future, with a new 20-year draft vision proposing improvements to Gap Creek recreation facilities, walking trails, picnic areas and access across the mountain.
Read: Future Off-Road Cycling Sites in Pullenvale Ward Identified in Newly Unveiled Strategy
Prepared by Brisbane Sustainability Agency for Brisbane City Council, the Draft Mt Coot-tha Vision 2026–2046 covers more than 1,700 hectares. It outlines possible changes to the Forest Reserve, Summit Lookout, Botanic Gardens and operating quarry, with an emphasis on protecting the natural environment while improving visitor facilities.
A community information session will take place at Kenmore Village on Thursday 5 November, from 10:00 a.m. to 2:00 p.m. Residents can discuss the proposals with the project team or submit feedback online until 30 November.
Gap Creek among areas proposed for improvement
For western-suburbs residents, some of the most relevant proposals centre on Gap Creek Picnic Area, where better facilities for mountain bike riders and a new skills track are being considered.
The draft also identifies opportunities for nature play at Gap Creek, JC Slaughter Falls and Simpson Falls. Other picnic areas could receive improved shelters, seating, shade, amenities and connections to nearby walking tracks.
Mt Coot-tha already has more than 90 kilometres of trails used for walking, cycling, running and horse riding. The vision proposes clearer signs, safer shared-use arrangements and improved trailheads to make the network easier to navigate.
Gap Creek would remain an important gateway for mountain biking, with opportunities to strengthen connections to the western reaches of Mt Coot-tha and the broader D’Aguilar National Park.
Better access could change how visitors reach the mountain
Getting around Mt Coot-tha is another focus of the draft, which acknowledges that some destinations are difficult to reach without a car. Parking is also limited at busy times, while connections between attractions are not always straightforward.
Among the options being investigated are dedicated bicycle shuttle services to popular riding destinations, including Gap Creek. The draft also proposes examining one-way vehicle sections along Sir Samuel Griffith Drive, particularly between Simpsons Road and the Paramount site, to improve separation between cyclists and vehicles while maintaining access.
A proposed arrival hub between the Botanic Gardens and future Quarry Parklands could eventually bring together parking, public transport, walking and cycling routes, and shuttle connections. These remain planning concepts, with no new Kenmore-specific transport service or road upgrade confirmed.
Protecting bushland while improving recreation
Environmental protection is a central part of the vision, alongside proposals to make Mt Coot-tha more accessible and enjoyable for families.
The reserve supports more than 450 native plant species and over 370 wildlife species, including koalas, greater gliders and powerful owls. Proposed conservation measures include habitat restoration, weed control, improved waterway health and better management of informal trails.
According to the community engagement report, more than 4,800 contributions were received through surveys, workshops and other activities. These included 3,526 individual responses to a visitor survey, with conservation, improved access and renewal of existing facilities emerging as common priorities.
Other ideas include a treetop walk, children’s garden and improved visitor facilities at the Botanic Gardens, although these would require further planning and approvals.
Quarry parklands remain a longer-term possibility
The operating 26-hectare Mt Coot-tha Quarry could eventually become public parkland, with recreational, cultural and nature-based activities among the possibilities.
However, the draft outlines a long-term transition rather than an immediate redevelopment. Quarry rehabilitation and detailed planning would need to precede any staged development, with future uses dependent on environmental investigations, funding and approvals.
The wider vision is not a funded construction program. Individual projects would require further decisions before work could proceed.
How Kenmore residents can have their say
Residents can attend the Kenmore Village information session on Thursday 5 November, between 10:00 a.m. and 2:00 p.m., or complete the official online feedback survey before 30 November.
Read: Gap Creek Road Closed as Flooding Disrupts Kenmore Hills Traffic
Brisbane Sustainability Agency expects to review submissions in early 2027, with the final Mt Coot-tha Vision anticipated for release in mid-2027. The consultation allows residents to influence how the mountain’s natural areas, recreation facilities and access arrangements are considered over the next two decades.
Published 4-Nov-2026














